Just a few short notes:
I’ve been working on a small project. A ex-pen for the dogs thats made
from PVC. I have about 1/2 the PVC sections cut out and
assembled. Next step will be finishing the cutting and then do
gluing. After that I need to find some netting or the like to cover
them and something to use for henges. (I was thinking velcro
straps). Hopefully I can get it all assembled before I head out on
my thanksgiving journey next week.
Speaking of the thanksgiving trip, I did some looking around and found
a hotel in Gallup, NM that allows more than one dog (costs $7 a
pet, but all the rest I looked at either don’t allow them at all,
or limit you to one per person). They also claim to have high
speed net. 🙂 The plan is to wander down there Wed and sleep the
night and leave only a 4-5 hour drive thursday to
Phoenix. Hopefully it will all work out ok.
The GURPS game I am putting together is starting to jell. Looks like
we will have the first session the wed after thanksgiving
(December 1st). I have 2 definite players, and about 3 more
possibles. 4 players would be great.